Mayor Packaging has already gained the International quality and quantity control certifications ISO9001、ISO22000、HACCP and BRC-IOP. These demonstrate that Mayor Packaging products have attained international market standards.

When the plant was built
During building of the factory, international food packaging standards and requirements were incorporated in Mayor Packaging’s construction plans, laying a solid foundation for our integrated quality system. A step further, Mayor Packaging’s modernized production plant has far exceeded the basic standards and requirements for a flexible packaging manufacturer, and can be favorably compared to a pharmaceutical factory of international standard.
Why Mayor Packaging needs IQS
Managing various local and international quality standards is never an easy task. Mayor Packaging has achieved this goal, thanks to its focus on the pursuit of quality and the philosophy contained within its Integrated Quality System. Mayor packaging is subjected to more than 30 audits and audit-related meetings very year. The management of these quality standards is a critical factor in maintaining standards and that is why the Integrated Quality System plays a major role both now and for the future.
What IQS is about
The Integrated Quality System is made up of the following elements.
One major Quality Manual oversees not only 19 Quality Procedures but more than 100 Quality Records. With this hierarchy, each single procedure regardless of its importance can be well defined and recorded which ensures the quality assurance that we seek.
Some of the Quality Procedures
- Document Control Procedure
- System Record Control Procedure
- Management Review Procedure
- Internal Audit Procedure
- Training Procedure
- Production Environment Control Procedures
Some of the Work Instructions
- Raw material inspection standard
- Product quality standard
- Bar-code scanning system
- Labeling and traceability system
- New product costing analysis
- Lab. Instrument operation instruction
- Machine operation instruction
- Pest Control
- Generator operation instruction
- Adhesive preparation instruction
|